Skip to content
Sam's Roofing Experts

Roof Replacement & Re-Roofing in Sydney

When the tiles are past coating, the battens have sagged or the roof is asbestos, replacement is the honest answer. Here is what a re-roof actually involves in Sydney, what it costs per square metre, and where the money goes.

NSW licence 502874C2-year workmanship warrantySame-day emergency attendance, where available4.9 on Google

New corrugated metal roof sheeting on a commercial building, apartment blocks behind
New corrugated metal roof sheeting on a commercial building, apartment blocks behind

What roof replacement costs in Sydney

2026 Sydney starting prices including GST for a complete re-roof. Per-square-metre figures are for comparison between quotes; the number that matters is the itemised total, and any quote that does not list sarking, battens, flashings, gutters and waste separately is hiding something in one of them. Quotes are free, written and done on site.

JobStarting price, inc. GST
Tile to Colorbond roof replacement, small home (about 120 m² of roof)From $14,400 (from $120 per m²)
New Colorbond sheeting over existing structureFrom $120 per m²; Colorbond Ultra adds from 20%
Re-tile with new concrete or terracotta tilesFrom $150 per m²
Asbestos roof removal by licensed removalistExtra from $60 per m²
Gutter and fascia replacement in ColorbondFrom $45 per lm; downpipes from $180 each

The variables that move the price

  • Roof area in m² and pitch
  • Single or two storey and scaffold requirement
  • Standard Colorbond or Colorbond Ultra for coastal exposure
  • Profile choice (Custom Orb, Trimdek or tile)
  • Asbestos present and the area to be removed
  • Condition of rafters, fascia and gutters

These are 2026 Sydney starting prices from our own quoting, not a promise for your roof. Every job is quoted free, on site and in writing after we have been on the roof. That is the number you can hold us to.

When a roof needs replacing rather than restoring

Restoration coats what is there. Replacement takes it off and starts again from the rafters. We recommend replacement when concrete tiles are soft through, terracotta is fretting and shedding glaze, battens have sagged so the courses run wavy, a metal roof is rusted through at the laps, the roof is asbestos cement, or the owner wants to go from tile to metal for the weight, the look or a long leak history. If you are on the fence, restore or replace sets out the tests we use, and how long each roof type lasts gives the realistic numbers.

Tile to Colorbond conversion

Most re-roofing we do in Sydney is a tile to Colorbond conversion, and it is more than swapping one covering for another. Tiles sit on battens at roughly 320 mm centres; Colorbond needs battens at up to 900 mm centres, fixed to carry the sheet, and the roof loses around 40 to 50 kg per square metre. The structure is usually fine with that, but rafter spacings need checking and occasionally a purlin added, and we look at that at the quote, not after the tiles are off.

The sequence on site:

  1. Scaffold or edge protection is set up to AS/NZS 1891, and the ceiling space is protected from falling debris where there is no sarking.
  2. Tiles, ridge caps and old battens are stripped and loaded straight into the skip. A 200 m² tile roof is around 8 to 10 tonnes of waste.
  3. Rafters and trusses are inspected. Rotten or split members are sistered or replaced; this is a variation only if we find something we could not see at the quote.
  4. New sarking is laid over the rafters to AS 4200.1; on a metal roof that is a foil-faced anti-condensation blanket, because a bare metal underside sweats on cold nights and drips onto the ceiling.
  5. New treated timber or steel battens are fixed at the spacing the sheet profile and pitch require.
  6. Sheets are laid starting from the end away from the prevailing weather, screwed through the crest with Class 4 fasteners, with correct end laps and turned-up ends at the ridge.
  7. Ridge capping, barge capping, valley gutters, flashings around every penetration, and new fascia and gutter are fitted. Downpipes are reconnected.
  8. The site is magnet-swept for screws and the skip removed.

The whole job on an average home takes four to seven working days. We take the roof off in sections so the house is never open overnight, and if rain arrives mid-strip the tarps go on immediately.

Profiles, grades and products

Two profiles cover most Sydney homes. Lysaght Custom Orb is the corrugated sheet that looks right on Federation, weatherboard and heritage houses and is rated down to 5 degrees of pitch. Trimdek is a squarer trapezoidal profile with a more contemporary look, rated down to 2 degrees, and often the better choice on low-pitch 1960s and 70s roofs where corrugated would be marginal. Both come in the full Colorbond range; see our Colorbond colour guide.

Standard Colorbond steel carries a BlueScope warranty of up to 36 years depending on the environment. Within about a kilometre of surf, or on the harbour foreshore, we specify Colorbond Ultra, which has a heavier metallic coating for salt exposure and adds from 20 per cent to the sheet cost. On the Northern Beaches, at Cronulla and along the Eastern Suburbs coast it is not optional if you want the warranty to hold; the metal roofing page goes into grades in more depth.

We also re-tile: new concrete or terracotta tiles on new battens and sarking, for owners who want to keep the look or are in a heritage area where the streetscape requires it. See tile vs Colorbond for how the two compare, and our tile roofing page for the options.

Insulation R-value

With the roof off is the cheapest moment you will ever have to insulate. The Building Code sets a minimum insulation R-value for the roof and ceiling in Sydney's climate zone. On a metal re-roof the anti-condensation blanket contributes part of it (typically R1.3 to R1.8), and ceiling batts make up the rest. Ask for the combined R-value in writing on the quote. A light colour such as Surfmist cuts roof-cavity temperature further and is worth choosing on west-facing roofs in the Hills and Western Sydney.

Asbestos roof removal

Any roof or eaves built before 1990 may contain asbestos cement; corrugated Super Six sheeting is the common one. Removal of more than 10 m² must be done by a licensed asbestos removalist under SafeWork NSW rules: sheets are wetted down, removed whole, wrapped and taken to a licensed facility, and a clearance certificate is issued before we start the new roof. We coordinate the removal as part of the re-roof. Asbestos roof removal adds from $60 per m² to the job and one to two days to the program.

Council approval and heritage areas

A like-for-like re-roof in the same material is generally exempt development in NSW and needs no council approval. Changing material (tile to metal), changing colour significantly on a heritage-listed house, or any roof change in a heritage conservation area in Hunters Hill, Balmain, Paddington, Beecroft, Mosman, Strathfield and parts of the Inner West usually needs a heritage exemption or a development application. We tell you at the quote if your street is affected and what the process looks like. Do not let anyone strip a heritage roof on the promise that the council will not notice.

Roof replacement cost per square metre

A tile to Colorbond re-roof starts from $14,400 including GST for a small home with about 120 m² of roof, which works out at a roof replacement cost per square metre from $120 supply and install. Re-tiling with new concrete or terracotta is from $150 per m². Colorbond Ultra, asbestos removal, structural repairs, a two-storey scaffold and new gutters and fascia are the items that push a job above the starting price. The roof replacement cost guide has worked examples by house size.

Because these jobs are over $20,000, the roofer must hold Home Building Compensation cover as well as a NSW Fair Trading licence, and the contract must be in writing. Ask to see both before paying a deposit; checking a NSW roofing licence takes a minute.

When replacement is not the right call

If the tiles are hard and the battens straight, and the problem is faded colour, cracked pointing and a few broken tiles, roof restoration does the job for a fraction of the price. One rusted valley or a run of failed ridge is a roof repair. We quote what the roof needs, and on a sound tile roof that is usually not a new roof.

Warranty and where we work

A new roof from us carries our 2-year workmanship warranty on top of the BlueScope material warranty, installed to AS 1562.1 for metal and AS 2050 for tile. We are licensed NSW roofers based in Gladesville and re-roof across all nine Sydney regions: Ryde, the North Shore, Hornsby, the Inner West, the Hills, the Northern Beaches, the Eastern Suburbs, Western Sydney and the Sutherland Shire. Request a free on-site quote. We measure the roof, check the structure from inside the ceiling, and give you a written, itemised price, usually within 24 to 48 hours.

What is included, and what is not

Hold this against the other quotes you have. If a line below is missing from theirs, ask why.

Included as standard

  • On-site measure, ceiling-space structural check and written itemised quote
  • Scaffold or edge protection to AS/NZS 1891
  • Strip and disposal of existing tiles or sheets, battens and ridge capping
  • New sarking or anti-condensation blanket to AS 4200.1
  • New battens at the correct spacing for the profile and pitch
  • Colorbond sheets, ridge and barge capping, valley gutters and all flashings
  • New Colorbond fascia and gutter with downpipes reconnected
  • Magnet sweep of the site and removal of all waste

Not included, or quoted separately

  • Licensed asbestos removal (coordinated by us, invoiced per m² on top)
  • Structural repairs to rafters or trusses found after the roof is stripped
  • Council development application fees or heritage consultant reports
  • Ceiling insulation batts unless specified in the quote
  • Removal and reinstallation of solar panels (arranged with an accredited installer)
  • Skylights, whirlybirds and new roof penetrations unless quoted
  • Stormwater work below ground level

Guides that go with this service

Roof Replacement: our own jobs

Photographed on site by our roofers. No stock photos.

All recent work →
  • New corrugated metal roof sheeting on a commercial building, apartment blocks behind
    New corrugated metal roof sheeting on a commercial building, apartment blocks behind
  • A red Colorbond roof over a backyard with trees behind
    A red Colorbond roof over a backyard with trees behind
  • A new grey Colorbond roof over a house, neighbouring roofs behind
    A new grey Colorbond roof over a house, neighbouring roofs behind
  • Light Colorbond roof sheeting in the sun
    Light Colorbond roof sheeting in the sun

Roof Replacement: questions we get asked

Do I need council approval to change from tiles to Colorbond?

Outside heritage areas, a re-roof is usually exempt development in NSW even when the material changes, provided the new roof is within the same footprint and height and the colour is not reflective in a way the exempt rules prohibit. Inside a heritage conservation area, or on a listed house, the material change almost always needs a heritage exemption or a development application. We check your address at the quote and tell you which applies before anything is ordered.

Is a Colorbond roof noisy in the rain?

On a re-roof done properly, no more than a tile roof. The noise people remember is from old sheds and verandahs with no lining underneath. A house re-roof includes an anti-condensation blanket under the sheets, which also dampens rain noise, and the ceiling and insulation batts below that absorb most of what is left. You will hear heavy rain start a little sooner than you did under tiles; you will not hear it drumming.

How long does a roof replacement take?

Four to seven working days for an average single-storey home, longer for two storeys, complex hips and valleys, or where asbestos removal comes first. Weather adds days: we do not strip a section we cannot close the same day. Scaffold usually goes up a day or two before we start and comes down after a final inspection. Lead time for Colorbond sheets in a standard colour is normally a week or two from deposit.

Can my existing roof structure take a metal roof?

Almost always, because Colorbond is far lighter than tile; the structure loses load rather than gains it. What changes is the batten spacing and the fixing pattern, which we set for the profile and the wind region. We check the rafters, ridge board and any trusses from inside the ceiling at the quote, and any rot or splitting we can see is priced in then. Occasionally a low-pitch roof needs a change of profile from corrugated to Trimdek to drain properly.

What happens with my solar panels during a re-roof?

They come off before we strip and go back on after the new roof is finished, and that work has to be done by an accredited solar installer, not by us. We coordinate the timing so the panels are off for the shortest possible period, and we fit the mounting brackets and flashings for the new roof so the installer is only reconnecting. Budget for the installer's removal and reinstall fee on top of the roofing quote.

Get a free roof replacement quote

We come out, get on the roof, photograph what we find and put every line in writing. No obligation and no sales call afterwards.

Call 0404 839 843Request a quote