Skip to content
Sam's Roofing Experts

Colorbond Roof Replacement in Sydney

Taking off an old tile roof or a rusted metal one and putting Colorbond steel on in its place. Here is what changes underneath the sheets, how long the house is a work site, and what a Sydney job costs, so you can check the other quotes against it line by line.

NSW licence 502874C2-year workmanship warrantySame-day emergency attendance, where available4.9 on Google

A red Colorbond roof over a backyard with trees behind
A red Colorbond roof over a backyard with trees behind

What colorbond re-roofing costs in Sydney

Typical 2026 Sydney starting prices including GST. The per-square-metre rate is useful for comparing quotes, but compare the line items too: battens, blanket, flashings, gutters, scaffold and waste should each appear. A quote that is far below these starting prices has usually left one of them out. Quotes are free, written and done on site.

JobStarting price, inc. GST
Tile-to-Colorbond roof replacement, small home (about 120 m² of roof)From $14,400 (from $120 per m²)
New Colorbond sheeting over existing structure (re-sheet)From $120 per m²
Upgrade to Colorbond Ultra for coastal exposureAdds from 20%
Asbestos roof removal by a licensed removalistExtra from $60 per m²
Colorbond gutter replacement, including removalFrom $45 per lm; downpipes from $180 each

The variables that move the price

  • Roof area in m² and roof pitch
  • Single or two storey, and how much scaffold is needed
  • Tile strip-out or re-sheet of an existing metal roof
  • Standard Colorbond or Colorbond Ultra
  • Number of valleys, wall junctions and penetrations to flash
  • Asbestos, and the condition of rafters, fascia and gutters

These are 2026 Sydney starting prices from our own quoting, not a promise for your roof. Every job is quoted free, on site and in writing after we have been on the roof. That is the number you can hold us to.

Which job are you actually being quoted for

Three different jobs get sold under the name Colorbond roof replacement, and the quotes on your table may not all be for the same one.

  • A tile to Colorbond conversion. The tiles, ridge caps and tile battens come off and a metal roof is built on the existing rafters. This is most of what we do.
  • Re-sheeting an existing metal roof. The old sheets come off, the frame and battens stay, and new sheets, screws and flashings go on.
  • A patch. A few sheets or one rusted valley replaced. That is a repair, and it is covered on the metal roofing page.

This page is about the first two. For re-tiling and the broader decision about whether the roof needs replacing at all, see roof replacement.

What changes when tiles become steel

A conversion is a small rebuild of the top of the house, and a quote that reads as tiles off, sheets on has left things out.

Roof weight

Concrete tiles weigh roughly 50 kg per square metre laid. A Colorbond roof with its battens and blanket is a small fraction of that, so the roof weight on the frame drops by 40 to 50 kg per m². The frame is almost never the problem. What matters is the other direction: a light roof is held down by its fixings, not by its own mass, so the battens have to be screwed to the rafters and the sheets fixed to the pattern for your wind exposure. On a ridge-top block in the Hills or an open coastal street, that fixing pattern is tighter.

Roof battens

Tile battens sit at about 320 mm centres and are sized to carry a tile, not to hold a screw under uplift. They come off. New roof battens, in treated timber or steel, go on at up to 900 mm centres to suit the sheet profile. We check the rafters from inside the ceiling at the quote, and again once the tiles are off. Split or rotten timber found at that point is shown to you and priced before we cover it.

Sarking or anti-condensation blanket

Many Sydney tile roofs built before the 1980s have no sarking at all, and where it exists it is usually brittle. Under metal we fit a foil-faced anti-condensation blanket over the battens, laid to AS 4200.1. Bare steel sweats on a cold clear night, and without the blanket that moisture drips onto the ceiling and looks exactly like a leak. The blanket also takes the edge off rain noise and adds to the roof's insulation. Ask each quote to name the product.

Roof pitch and profile

Roof pitch decides the profile before taste does. Corrugated Custom Orb needs at least 5 degrees. Trimdek works down to 2 degrees. Most tiled houses sit well above both, but a rear extension or a verandah tiled at a low pitch is often the part that has always leaked, and the conversion is the chance to put the right sheet on it. We measure the pitch of every roof plane at the quote.

Flashings, valleys and gutters

Every junction is remade: ridge and barge capping, valley gutters, apron and step flashings where the roof meets a wall or chimney, and collars at each pipe and vent. Reusing old tile flashings under a new metal roof is where most leaks on cheap conversions come from. We replace gutters and fascia cover at the same time in most cases, because the gutter has to suit the new sheet edge and the scaffold is already up. Box gutters and unusual downpipe runs are roof plumbing work and are itemised.

When re-sheeting is enough

If the roof is already metal, you may not need a full strip to the rafters. Re-sheeting works when the battens are sound, straight and at a spacing that suits the new profile, and the fault is in the sheets themselves: rust through at the laps, perished screws, a coating that has chalked away. We take off the old sheets, check and re-fix the battens, lay a new blanket, then fit new sheets and all new flashings.

Re-sheeting is not enough when the battens are undersized hardwood that splits on a screw, when the old sheeting is asbestos cement, or when the frame has sagged. The crew does not remove asbestos. A licensed removalist is arranged, shown as its own line on the quote, and issues a clearance before we start.

How long it takes and living through it

An average single-storey home takes four to seven working days once materials are on site. Two storeys, a cut-up roof with many hips and valleys, or an asbestos removal first all add time. Scaffold or edge protection goes up before we start.

You can stay in the house. We strip only what we can sheet and make weathertight the same day, so the roof is never open overnight. Expect:

  • Noise from early morning on strip days, and grit falling into the roof space. Cover anything stored up there.
  • A skip and a sheet delivery, so the driveway is out of use for most of the week.
  • Solar panels off before we start and back on after, by an accredited installer.
  • Rain stopping work. The exposed section is tarped and the job waits.

Choosing the steel and the colour

Standard Colorbond steel suits most of Sydney. Close to surf or on the harbour foreshore we specify Colorbond Ultra, which costs more and is the grade BlueScope's warranty expects in that exposure. On the North Shore that mostly means the harbourside streets, not the bushland suburbs further up the line.

Colour is more than looks. A light roof runs cooler in a Western Sydney summer, and some councils and heritage conservation areas restrict what is allowed on a street-facing roof. Our guide to Colorbond colours for Sydney homes covers the range. Still weighing up whether to leave tile at all? Read tile vs Colorbond first.

What it costs

A conversion starts from $14,400 including GST for a small home with about 120 m² of roof, which is from $120 per m² supplied and installed. Size, pitch, storeys and the grade of steel move it up from that starting price. The Colorbond roof cost guide breaks the number down. A job over $20,000 needs Home Building Compensation cover and a written contract, so ask every quoting roofer for both. Our details are on the licence and insurance page.

When it is the wrong job

If the tiles are hard and the battens straight, a roof restoration costs a fraction of a new roof. A sound terracotta roof in a heritage street is usually worth keeping, and our tile roofing crew can repair it. We would rather quote the smaller job than sell a roof you do not need.

Warranty

Our work carries a 2-year workmanship warranty, set out on the warranty page. The steel is covered separately by BlueScope's own material warranty, which depends on the product and how close you are to salt water. Book a free on-site quote and we will measure the roof, check the frame from inside and give you a written, itemised price.

What is included, and what is not

Hold this against the other quotes you have. If a line below is missing from theirs, ask why.

Included as standard

  • On-site measure, pitch check and ceiling-space inspection before the written quote
  • Scaffold or edge protection for the duration of the job
  • Strip and disposal of old tiles or metal sheets, ridge caps and tile battens
  • New roof battens fixed to the rafters at the spacing the profile needs
  • Foil-faced anti-condensation blanket under the sheets
  • Colorbond sheets, ridge and barge capping, valleys and all new flashings
  • New gutters and fascia cover where quoted, with downpipes reconnected
  • Magnet sweep of the yard and removal of all waste

Not included, or quoted separately

  • Asbestos removal (done by a licensed removalist we arrange, itemised separately)
  • Rafter or truss repairs found once the old roof is off
  • Removal and refit of solar panels by an accredited installer
  • Council or heritage approval fees where the street requires them
  • Ceiling insulation batts unless listed in the quote
  • Skylights, vents and new roof penetrations unless listed in the quote

Guides that go with this service

Colorbond Re-Roofing: our own jobs

Photographed on site by our roofers. No stock photos.

All recent work →
  • A red Colorbond roof over a backyard with trees behind
    A red Colorbond roof over a backyard with trees behind
  • A new grey Colorbond roof over a house, neighbouring roofs behind
    A new grey Colorbond roof over a house, neighbouring roofs behind
  • Light Colorbond roof sheeting in the sun
    Light Colorbond roof sheeting in the sun
  • A new Colorbond roof looking down the street on a cloudy day
    A new Colorbond roof looking down the street on a cloudy day

Colorbond Re-Roofing: questions we get asked

Can my house frame take a Colorbond roof after tiles?

Yes, in almost every case. Steel sheeting is far lighter than tile, so the frame carries less load than it was built for. What has to change is how the roof is held down, because a light roof relies on its fixings in strong wind. We fit new battens screwed to the rafters and fix the sheets to the pattern for your wind exposure. The rafters are checked from inside the ceiling at the quote and again once the tiles are off.

Can you lay Colorbond over the existing tiles?

No, and be wary of anyone who offers to. The tiles and tile battens have to come off so new battens can be fixed to the rafters at the right spacing and a blanket laid under the sheets. Sheeting over tiles leaves the old weight on the frame, gives the screws nothing sound to hold and traps moisture between the two layers. The only over-the-top job that works is re-sheeting an existing metal roof on sound battens.

Can we live in the house while the roof is replaced?

Yes. We strip one section at a time and sheet it the same day, so the house is never open overnight. Strip days are loud and some grit falls into the roof space, so cover anything stored there and keep cars out of the driveway while the skip and the sheet delivery are in. If rain arrives part way through a day, the exposed section is tarped and work stops until it clears.

How long does a tile to Colorbond roof replacement take?

Four to seven working days for an average single-storey home once the sheets are on site. Two-storey homes, roofs with many hips and valleys, and jobs where a licensed removalist has to take off asbestos first run longer. Weather adds days, because we do not strip a section we cannot close the same day. We give you a start date and a realistic finish window with the written quote.

Do I need council approval to replace tiles with Colorbond?

For most Sydney homes a re-roof is exempt development and needs no approval. The exceptions are heritage-listed houses and heritage conservation areas, such as parts of Hunters Hill, Balmain, Paddington and Mosman, where changing the roof material or colour usually needs council approval or a heritage exemption. We check your address when we quote and tell you which applies before any steel is ordered.

Should I replace the gutters at the same time as the roof?

Usually, yes. The gutter has to suit the edge of the new sheets, old gutters on a tired roof are rarely far behind it, and the scaffold is already paid for. Doing it later means a second set-up and working around new flashings. If your gutters are recent and sound we will say so and leave them. Either way the gutter and downpipe work is a separate line on the quote.

Get a free colorbond re-roofing quote

We come out, get on the roof, photograph what we find and put every line in writing. No obligation and no sales call afterwards.

Call 0404 839 843Request a quote