Skip to content
Sam's Roofing Experts

Commercial & Industrial Roofing in Sydney

Strata roofing, retail and warehouse work across Sydney: box gutter rectification, metal re-sheeting, leak repairs, safety-compliant access and scheduled maintenance. Written for the strata manager or facilities manager who needs a report, a price and a crew that turns up when the tenants have gone home.

NSW licence 502874C2-year workmanship warrantySame-day emergency attendance, where available4.9 on Google

New corrugated metal roof sheeting on a commercial building, apartment blocks behind
New corrugated metal roof sheeting on a commercial building, apartment blocks behind

What commercial roofing costs in Sydney

Typical 2026 Sydney starting prices including GST. Commercial scope varies more than residential, so these are starting points rather than a menu. Access, storeys, after-hours requirements and the condition of what is under the roof move the price more than area does. Every figure is confirmed in a written scope after a site visit.

JobStarting price, inc. GST
Commercial box gutter rectificationFrom $2,500
Warehouse and factory re-sheeting, Colorbond over existing structureFrom $120 per m²
Leak detection and repair on metal deck or parapetFrom $350; complex from $1,200
Asset condition report with photosFrom $250
Emergency make-safe, commercial or strata$150 call-out fee plus make-safe works from $200
Roof and box gutter clean, two storey or higherFrom $400 per visit

The variables that move the price

  • Access: ladders, anchor points, EWP or scaffold
  • Number of storeys and whether the roof is over trading or occupied space
  • After-hours, weekend or staged works
  • Coastal exposure requiring Colorbond Ultra and marine-grade fixings
  • Condition of purlins, sumps and linings found once work starts
  • Reporting and certification requirements from the strata plan or insurer

These are 2026 Sydney starting prices from our own quoting, not a promise for your roof. Every job is quoted free, on site and in writing after we have been on the roof. That is the number you can hold us to.

Who this page is for

If you manage a residential strata block, a retail strip, a warehouse or a factory unit, you are not buying a roof. You are buying a report your committee or owner can act on, a price you can defend, and a contractor who works around tenants without anyone getting hurt. Homeowners are better served by the roof repairs page.

We are a four-person crew. That suits strata blocks up to a few dozen lots, retail strips, mid-sized warehouses and factory units, and multi-building sites where work can be staged. For a very large single-span re-roof needing a dozen roofers on site at once, you want a larger contractor, and we say so at the first call.

What we do on commercial roofs

  • Box gutter rectification: new sumps, overflows, gutter linings and re-grading
  • Warehouse re-sheeting in Colorbond and Zincalume, including replacement of failed translucent sheets
  • Leak detection and repair on metal decks, membrane roofs and parapet flashings
  • Roof safety anchor points supplied, installed and certified, plus static lines where needed
  • Gutter and downpipe replacement on strata and retail buildings
  • Roof and box gutter cleaning, scheduled or one-off
  • Emergency make-safe after storms, with photos for the insurer
  • Asset condition reports for capital works planning
  • Scheduled maintenance contracts covering all of the above

Box gutters: the commercial leak

Most commercial and strata leaks in Sydney are not the roof. They are the box gutter: the concealed gutter that runs behind a parapet or between two roof planes, which on 1960s to 1980s walk-ups in Dee Why, Bondi and Randwick was often built undersized, without an overflow, and lined with galvanised steel that has now rusted through at the sump.

A box gutter fails in a predictable order. Debris builds up at the sump, water ponds, the ponding rusts the lining, and the first heavy downpour that exceeds the gutter's capacity has nowhere to go but into the top-floor ceiling. The fix is rarely a patch. Rectification means measuring the catchment, sizing the gutter, sumps and overflows to AS/NZS 3500.3, cutting out the failed lining, fitting a new one with proper fall to the sump, and adding an overflow so the next storm goes out the wall instead of down the stairwell. This is where gutter replacement crosses over with roofing; we handle both.

Warehouse re-sheeting

Older warehouse and factory roofs in Brookvale, Artarmon, Auburn and around Macquarie Park are usually Trimdek or Klip-Lok profiles on steel purlins, with translucent fibreglass skylights every few bays. The metal outlasts the skylights: the fibreglass goes brittle, hail punches through it, and the roof leaks in a dozen places at once.

Warehouse re-sheeting is done in stages so the building keeps trading. We strip and replace one section at a time, never leaving an area open overnight, and replace the translucent sheets with polycarbonate at the same time. If the purlins have rusted at the fixings, we tell you before quoting, not after. Colorbond Ultra is specified for sites within a kilometre or so of the coast; the metal roofing page covers the profiles and the BlueScope warranty conditions in more detail.

Safety and compliance

Every commercial job starts with paperwork, and we would rather you asked for it than assumed it.

  • A site-specific SWMS (safe work method statement) is prepared for any work at height and given to you before we start. Working on a roof over two metres is high-risk construction work under NSW WHS regulation and requires one.
  • Fall arrest is to AS/NZS 1891. Where the building has certified roof safety anchor points we use them; where it does not, we either install and certify anchors as part of the job (a good investment for any building that gets regular roof access) or work from an elevated work platform with an exclusion zone below.
  • We hold public liability insurance and a NSW Fair Trading contractor licence; certificates of currency and the licence number are supplied with the quote so your file is complete.
  • Exclusion zones, signage and tenant notices are ours to manage, in coordination with your building manager.

Anchor points need periodic recertification, usually every 12 months. If yours are overdue, we will say so in the report.

After-hours works

Retail strips cannot have a roofer over the shopfront at lunchtime, and a warehouse with forklifts underneath cannot have sheets coming off mid-shift. After-hours works are normal for us: evenings, weekends and early starts, priced with a premium and agreed in writing before we book. Emergency make-safe is available the same day where availability permits; for a strata block that means a tarp and a temporary fix, with photos sent to you and the insurer before the crew leaves.

Asset condition reports and maintenance contracts

A strata committee planning its capital works fund needs to know whether the roof has three years or fifteen left, and what it will cost either way. An asset condition report gives them that: every roof plane, box gutter, flashing, skylight and anchor point photographed and rated, defects listed in priority order, and indicative costs against each so the ten-year plan can be built on numbers rather than guesses.

For buildings that need ongoing attention, a scheduled maintenance contract puts it on a calendar: box gutters and downpipes cleared before each storm season, fixings and flashings checked, anchor points inspected, and a short report after each visit. Most strata and retail clients run six-monthly; sites under heavy tree cover or with known box gutter issues run quarterly. The inspections and maintenance page has the detail on what a report contains and how the schedule is set.

What it costs

Commercial pricing depends on scope, access and hours more than roof area. A box gutter rectification on a three-storey block after hours is a different number from the same gutter on a single-storey shop. The table below gives the starting prices we work from. Every quote follows a site visit and comes as a written scope your committee can table. Inspection and report fees are typically waived when we do the work.

When we are not the right call

  • A large single-stage re-roof needing a big crew on site at once: bigger contractor.
  • Full membrane replacement on a flat concrete roof: that is a waterproofing specialist, and we will refer you.
  • Anything involving asbestos-cement roofing over 10 m²: a licensed asbestos removalist does the removal, and we do the new roof afterwards.

Warranty

All commercial work carries our 2-year workmanship warranty. Colorbond sheeting carries BlueScope's warranty of up to 36 years depending on product and environment; anchor points carry the manufacturer's certification. Warranty documents are supplied with the final invoice so they sit on the building's file.

We work commercially across Sydney, with the shortest response times around Ryde and Macquarie Park, the Inner West and Western Sydney. To start, request a site visit and written quote, or call if it is leaking now.

What is included, and what is not

Hold this against the other quotes you have. If a line below is missing from theirs, ask why.

Included as standard

  • Site visit and written scope addressed to the strata or facilities manager
  • Site-specific SWMS and fall-arrest plan to AS/NZS 1891 before work starts
  • Certificate of currency for public liability insurance and NSW licence details with the quote
  • Photo report of existing condition before and after works
  • Tenant notices, exclusion zones and signage coordinated with your building manager
  • Removal and disposal of old sheeting, gutter linings and debris
  • Warranty documents supplied with the final invoice for the building file
  • 2-year workmanship warranty in writing

Not included, or quoted separately

  • Scaffold or elevated work platform hire (quoted as a line item where needed)
  • Asbestos-cement removal (licensed removalist, coordinated but separately invoiced)
  • Full membrane waterproofing on flat concrete roofs (referred to a waterproofing specialist)
  • Structural steel repairs to purlins or rafters found once sheeting is lifted
  • Engineering certification where a council or insurer requires it
  • After-hours premium, unless the quote is written for after-hours works

Guides that go with this service

Commercial Roofing: questions we get asked

Can you provide a SWMS and certificate of currency before starting work?

Yes, and you should not accept a roofer on a commercial site without them. We prepare a site-specific safe work method statement for any work at height, which is required under NSW WHS regulation for high-risk construction work, and supply it with the quote along with a certificate of currency for public liability insurance and our NSW Fair Trading contractor licence details. If your building has an induction process or a contractor portal, we complete it before the first visit.

Do you work after hours on retail and strata buildings?

Yes. Evenings, early mornings and weekends are routine for retail strips and any warehouse that operates during the day. After-hours works carry a premium that is written into the quote so there are no surprises on the invoice. For strata blocks we generally work standard hours with tenant notices issued through the building manager, and switch to after-hours only where noise or access over occupied units makes it necessary. Emergency make-safe is available the same day where availability permits.

What does an asset condition report include?

Every roof plane, box gutter, downpipe, flashing, skylight and anchor point photographed and rated, with defects listed in priority order and an indicative cost against each so the committee can build its capital works fund plan on real numbers. Where it helps, we add a drone survey for the overview shots. The report is written to be tabled at a strata meeting or attached to an insurance claim, and the fee is usually waived when we carry out the works it recommends.

Our box gutter overflows into the top-floor unit in heavy rain. Is that a clean or a rebuild?

It depends on why it overflows. If the sump is blocked with debris, a clean and a maintenance schedule fixes it. If the gutter is undersized for its catchment, has no overflow or the lining has rusted through at the sump, cleaning buys a few months and the next big storm does it again. We measure the catchment and check the gutter against AS/NZS 3500.3, then tell you which it is. On 1960s to 1980s walk-ups it is usually the second, and rectification is the honest quote.

Do you install roof anchor points, and how often do they need certifying?

Yes. We install and certify permanent roof safety anchor points and static lines for buildings that need regular roof access, which is a much better long-term answer than hiring an elevated work platform every time a gutter needs clearing. Fall-arrest systems are installed to AS/NZS 1891 and need periodic recertification, typically every 12 months. If your building's anchors are missing tags or overdue, we flag it in the condition report and can recertify them as part of a maintenance visit.

Can you handle a warehouse re-roof while the tenant keeps operating?

For most Sydney warehouses and factory units, yes. We stage warehouse re-sheeting bay by bay, never leave a section open overnight, and set exclusion zones inside so forklifts and staff stay clear of the area being worked. Where a tenant cannot have anyone above a particular area during shifts, that section is done after hours. What we are honest about is scale: a very large single-span roof that needs a dozen roofers on it at once is better suited to a bigger contractor, and we will tell you at the first call.

Get a free commercial roofing quote

We come out, get on the roof, photograph what we find and put every line in writing. No obligation and no sales call afterwards.

Call 0404 839 843Request a quote