The short answer
Roof repointing is priced by the lineal metre of ridge and hip capping. In Sydney in 2026 a proper job, where the caps are lifted, re-bedded in fresh mortar and repointed with a flexible compound, costs from $45 per lineal metre including GST. On a small gable roof with about 20 lineal metres of ridge the whole roof starts from $900.
If you are reading this from another Australian city, the dollar figures will shift a little with local labour rates, but the way the number is built does not change. Somebody measures the ridges and hips, decides how much of the bedding has failed, and multiplies. If you know your metres and you know which job is being quoted, you can check any price you are given.
Bedding and pointing are two different things
The words get used loosely, and that is where most of the confusion over price comes from.
- Bedding is the mortar the ridge and hip caps sit on. It holds the caps in place and sets their line.
- Pointing is the finishing layer over the edge of the bedding, the band you can see from the street. On older roofs it is rigid cement. Modern flexible pointing is an acrylic compound that moves with the roof instead of cracking.
- Re-bedding means lifting the caps, chipping out the old bedding mortar, laying a new bed and setting the caps back straight.
- Repointing means applying new pointing. It can be done after a re-bed, or on its own over old bedding that is still sound.
"Repointing" in a quote can mean either the full job or the pointing layer only. The two are not the same price and they do not last the same length of time. More on that below.
Roof repointing cost by ridge length
The table uses the starting rate of $45 per lineal metre for a full re-bed and repoint, GST inclusive. Ridge length is the total of every ridge and hip on the roof, measured along the caps.
| Total ridge and hip capping | Typical roof | Re-bed and repoint, 2026 starting price |
|---|---|---|
| A few loose caps or one short run | One hip or one end of a ridge | Priced as a repair: from $350 for a minor repair, from $900 where a whole section is re-bedded |
| About 20 lm | Small gable roof, villa or semi | From $900 |
| About 30 lm | Two or three-bedroom home, simple hip roof | From $1,350 |
| About 40 lm | Three-bedroom hip-and-gable home | From $1,800 |
| About 50 lm | Larger home, several hips and a valley or two | From $2,250 |
Whole-roof jobs start from $900 at about 20 lineal metres. Roofs with more than 50 metres of capping, steep pitches and two-storey roofs that need scaffold or edge protection cost more again, and the access equipment is itemised as its own line.
Costs that can sit alongside the ridge work:
- Broken tiles found on the day: extra tiles are from $8 each supplied, depending on the profile
- A stand-alone inspection with a photo report, if you want the roof documented without committing to work: from $250. The quote itself is free.
What moves the price
How much ridge you have
Floor area is a poor guide. A long, simple gable roof has one ridge down the middle and might carry 15 to 20 metres of capping. A hip roof on the same footprint has a shorter ridge but four hips running down to the corners, and can easily carry twice as much. Add a front gable, a rear extension and a couple of Dutch gables and the metres climb again. This is why two homes of the same size can get very different quotes.
Whether the bedding has failed
Push on a cap. If it rocks, or you can see gaps where the mortar has washed out from under it, the bedding is finished and the cap has to come off. If the caps are solid and only the surface pointing is cracked, repointing alone may be enough, and that is the cheaper job because there is no lifting, no chipping out and far less mortar. We do not publish a separate repoint-only rate because it depends on what is under the pointing; it is quoted on site once we have tested the caps.
On a roof more than about 20 years old, sound bedding along every ridge is rare. Usually some runs need a full re-bed and others do not, and an honest quote says which is which.
Pitch, height and access
A low-pitched single-storey roof can be walked and worked quickly. A steep roof needs roof ladders and harness anchor points, and everything slows down, including getting mortar up there. Two-storey homes need edge protection or scaffold to meet fall-arrest requirements under AS/NZS 1891, and that is quoted separately so you can see it.
Tile type and the caps themselves
Concrete tiles and their caps are tough and usually lift cleanly. Old terracotta tiles and caps are more brittle, and some will crack when they are lifted after 60 or 80 years in the one spot. Replacement terracotta caps have to be matched, sometimes from a second-hand tile yard, and the quote should carry an allowance for it.
Re-bed and repoint, or repoint only?
| Repoint only | Full re-bed and repoint | |
|---|---|---|
| What is done | Old pointing raked back, new flexible pointing applied over the existing bedding | Caps lifted, old bedding removed, new mortar bed laid, caps re-seated straight, then flexible pointing |
| Right when | Bedding is hard, caps do not move, only the surface has cracked | Caps are loose, bedding is cracked or washed out, the ridge line has moved |
| How long it lasts | A long time on sound bedding; a few years over failed bedding | Longer than a roof coating, which is typically 10 to 15 years |
| Cost | Lower, quoted on site | From $45 per lineal metre |
The detail of how the work is done is on our roof repointing and ridge capping page.
Worked examples by house type
These are typical figures, not quotes. They assume a full re-bed and repoint at the per-metre rate.
Post-war single-storey home with a simple gable roof. One main ridge and perhaps a short ridge over a front room, about 20 lineal metres in all. Easy pitch, driveway access. From $900.
Three-bedroom brick home with a hip roof. The most common job we see in Sydney's middle-ring suburbs. A short main ridge, four hips and often a front gable: 35 to 45 lineal metres. At 35 metres that is from $1,575, and every extra metre of hip adds to it.
Larger two-storey home. Fifty metres or more of capping, so from $2,250 for the ridge work at 50 metres, plus scaffold or edge protection as a separate line. The access cost on a two-storey roof is often the reason quotes differ.
Federation or interwar home with terracotta tiles. Common across the Inner West and the lower North Shore. Roughly 30 lineal metres on a typical cottage, so from $1,350, with an allowance for caps that break on lifting and need matching. Steeper pitches on these homes push the rate above the starting price.
One hip that has let go after a southerly. This is a repair, not a per-metre job. A few caps re-bedded and repointed is a minor repair, from $350. If the whole hip or a full section of ridge needs redoing, it is a moderate repair, from $900. Our roof repair cost guide covers how those are priced.
What a quote should itemise
Ask for these in writing. If any are missing, you cannot compare the quote with another one.
- Lineal metres of ridge and hip, measured on the roof, not estimated from the street
- Which runs are a full re-bed and which are repoint only, and why
- The pointing product by name, and confirmation that it is a flexible pointing compound and not cement mortar
- An allowance for replacement caps and tiles, with the per-tile rate for anything above it
- Weep holes kept open along the bottom edge of the pointing so water that gets under a cap can drain out
- Access: roof ladders, anchor points, edge protection or scaffold, each stated
- Clean-up, including old mortar removed from the roof, valleys and gutters
- GST included, and the workmanship warranty in writing. Ours is 2 years, and the terms are on the warranty page.
What cheap quotes leave out
| What is missing | Why it matters |
|---|---|
| Repoint only, described as "repointing" with no mention of bedding | New pointing over moving caps cracks again within a few years |
| Cement mortar instead of flexible pointing | Rigid pointing cracks with the first summer of roof movement, which is how the original failed |
| No metres stated | You cannot tell whether every ridge and hip is covered or only the ones facing the street |
| Pointing smeared over the weep holes | Water that gets under the cap is trapped and comes through the ceiling instead |
| No cap or tile allowance | Variations appear mid-job when caps break on lifting |
| Old mortar left in the valleys and gutters | Blocked valleys and downpipes in the next heavy rain |
| No written warranty | Nothing to hold anyone to when a cap comes loose |
A price well under $45 per lineal metre for something described as a full re-bed should make you ask how many caps are actually being lifted.
When the cheaper job is a false economy
Repointing over failed bedding. It looks identical from the ground on the day the roofer leaves. The caps are still loose underneath, the new pointing cracks, and you pay for the full job a few years later on top of the first one.
Pointing a roof that is past it. If the tiles themselves are soft, fretting or breaking under foot, new ridge work sits on a roof that still needs replacing. We would rather tell you that at the quote. Our guide to restoring versus replacing sets out how to tell.
Patching one hip at a time. If one ridge has failed from age, the others are the same age. Three separate repair visits cost more than one whole-roof job priced by the metre.
It can also go the other way. If the tiles are sound and the roof only looks tired, ridge work on its own, from $900 on a small roof, is often all the roof needs, and a full roof restoration, from $4,500 for a typical three-bedroom single-storey home, is more than you have to spend. If you do plan to restore or paint within a year or two, do the ridges as part of that job, since they are included in a proper restoration and the coating goes over the new pointing. The restoration cost guide shows how the ridge work fits into that price.
How long it takes
Full ridge re-bedding and repointing on a hipped single-storey roof is usually a day for two roofers. Larger and two-storey roofs take two. Mortar and pointing need dry weather to cure, so a wet forecast can push the job by a day or two. You do not need to be home, though cars are best moved off the driveway.
Should you do it yourself?
We would not. The materials are cheap; the risk is the roof. Walking a tiled roof without knowing where to step cracks tiles, lifting caps on a pitch without a harness is how falls happen, and a ridge line set crooked stays crooked. A handyman price that skips the safety gear is not a saving if someone comes off the roof.
Getting a price for your roof
The only way to turn a starting price into a figure is to measure the ridge and test the caps. We do that on the roof, for free, and send a written quote with photos, usually within 24 to 48 hours of the visit. All prices include GST. You can read more about our ridge capping repointing service, book a free on-site quote or call 0404 839 843. We are based in Gladesville and work across all of Sydney.