Why the roof is where a house catches fire
In a bushfire, embers are blown kilometres ahead of the front and land on roofs. If they find dry leaves in a gutter, a gap under a ridge cap, an open vent or torn sarking, they smoulder in the roof space long before any flame reaches the block. That is how most houses are lost, and why the preparation that matters most happens at gutter level, not in the garden.
Sydney's bushfire-prone edge runs through established suburbs: St Ives, Hornsby, Pennant Hills and Dural in the north; Ingleside, Duffys Forest and Avalon on the Northern Beaches; Menai and Bangor in the south. Many of the houses are 1960s to 1980s tile roofs with no sarking and gutters full of gum litter. They can be made a great deal safer without replacing anything, and this page is the list.
BAL ratings and AS 3959, in plain terms
AS 3959 is the Australian Standard for construction in bushfire-prone areas. It sorts sites into Bushfire Attack Levels based on the vegetation nearby, its distance, the slope between it and the house, and the region's fire weather. The number is the radiant heat, in kilowatts per square metre, the building is expected to face.
| BAL | What it means | What it asks of the roof |
|---|---|---|
| BAL-LOW | Risk too low for specific construction requirements | Good maintenance only |
| BAL-12.5 | Ember attack, low radiant heat | Sarked or sealed roof, 2 mm metal mesh on every opening, non-combustible gutter guard if any |
| BAL-19 | Ember attack with more radiant heat | As BAL-12.5, tighter requirements on roof lights and vents |
| BAL-29 | Heavy ember attack, higher radiant heat | As BAL-19, plus stricter material rules for penetrations and fittings |
| BAL-40 | Very high radiant heat, possible flame contact | Non-combustible roof, gutters and downpipes; ember screens usually steel rather than aluminium |
| BAL-FZ | Flame Zone, direct flame contact | Specialist construction beyond this page |
AS 3959 applies to new building work, extensions and, through council conditions, alterations such as a roof replacement. It does not force you to retrofit an existing house, but its requirements are the best description of what keeps embers out, so we use them as the benchmark for any roof in a bushfire zone. Your BAL is also not the same as being on Bushfire Prone Land: the section 10.7 planning certificate says whether the RFS has mapped the land as bushfire prone; the BAL is assessed for your specific site by an accredited bushfire consultant or the council when you lodge a development application.
Ember entry points on a Sydney roof
Go through these with binoculars from the ground and a torch in the roof cavity. Anything you can see daylight through is a way in.
- Under the ridge and hip caps. Bedding mortar falls out over time, leaving open gaps under every cap. Re-bedding and re-pointing closes them.
- The eaves and the roof-wall junction. Where the roof meets the top of the wall there is often an open gap, especially on older homes. A metal ember guard closes it.
- Unsarked tile roofs. Without sarking, every gap between tiles is a route into the cavity. AS 3959 requires it at BAL-12.5 and above; retrofitting means lifting the tiles, so it is usually done with a restoration or re-roof.
- Corrugated sheet ends. The corrugations are open at the eave and ridge unless a profiled filler strip or ember guard is fitted.
- Vents and whirlybirds. Each needs metal mesh with openings of 2 mm or less behind it.
- Skylights, roof windows, coolers and duct penetrations. Polycarbonate domes and unrated glass are weak points; cooler units need ember screens; every penetration needs its flashing sealed.
- Gutters and valleys. Not an entry point, but the fuel; dry leaves under an unsealed eave is the classic ignition.
- Storm damage. Last summer's lifted sheet or cracked tile is this summer's ember opening.
Ember-rated gutter guard
Gutter guard in a bushfire zone keeps the fuel out of the gutter and screens the gap between gutter and roof edge. To do either job it has to survive an ember landing on it.
- It must be non-combustible: aluminium or steel mesh. Plastic guard melts or burns and becomes part of the problem.
- The openings must be 2 mm or smaller so an ember cannot pass through.
- It must be fixed continuously, with no gaps at joins, corners or outlets, or litter builds up underneath where you cannot see it.
- At BAL-40 and Flame Zone, aluminium is generally not accepted because of its melting point and steel mesh is specified; check with your BAL assessor.
- It should cover the roof edge too, not just the gutter opening; on a corrugated roof that means profiled trims. Valleys need their own guard.
We install ember-rated gutter guard to AS 3959 from $45 per lineal metre, with the price depending on roof type, valleys and colour matching. Standard leaf mesh is from $25 per lineal metre, or from $1,250 for 50 lineal metres on a metal roof; the difference is the aperture, the fixing and the trims. Mesh carries manufacturer warranties of 15 to 25 years.
One caveat: guard reduces cleaning, it does not remove it. Fine gum litter still settles on top and needs blowing off before the season; see how often to clean gutters in Sydney.
Gutter plugs and filling the gutters
On a day of Extreme or Catastrophic fire danger, RFS advice for a prepared house includes blocking the downpipes and filling the gutters with water so embers landing in them go out. It works, but only if you are set up in advance.
- Buy a plug for every downpipe: a rubber bung or inflatable bladder that seals the outlet from above.
- Know which outlets you can reach safely with a ladder. Two-storey outlets often have to be plugged from the roof, before the day, not on it.
- Check the gutters are sound enough to hold the weight of water; a rusted or sagging gutter will not.
- Remove the plugs when the danger passes, or the first storm overflows behind the fascia.
What the RFS asks of you
The NSW RFS runs its Get Ready campaign each September, before the Bush Fire Danger Period usually starts on 1 October. Its guidance for homeowners comes down to a short list, most of it roof and gutter work.
- Clean leaves and twigs out of gutters, valleys and off the roof.
- Fit metal gutter guards.
- Trim trees and branches overhanging the roof.
- Seal gaps under the roof and in the eaves, and screen vents with metal mesh.
- Repair damaged or missing tiles.
- Fit metal flyscreens to windows and doors.
- Keep the lawn short and the garden clear of flammable material against the house.
- Have gutter plugs, a hose that reaches around the house, and water that works without mains power.
- Write a Bush Fire Survival Plan and decide in advance whether you will leave early or stay and defend.
The checklist: work through it before 1 October
From the ground
- Walk every side with binoculars, noting gaps at the eaves, under ridge caps, at sheet ends and around penetrations.
- Look at the gutters and valleys. Anything green or brown in them is fuel.
- Check the gutter guard is metal, is intact at every join, corner and outlet, and covers the roof edge.
- Note every branch over the roof or within two metres of the gutter.
- Find every downpipe outlet and check you have a plug that fits it.
From inside the roof cavity
- With the torch off on a bright day, look for daylight at the eaves, the ridge, the sheet ends and around vents and skylights.
- Check the sarking, if there is any, for tears and missing sections.
- Check every vent and whirlybird has a fine metal mesh behind it.
Work to book
- A gutter and valley clean, from $250 single storey or from $400 two storey, in September and again if the canopy drops before the season peaks.
- Re-bedding and re-pointing of any ridge with open gaps, from $45 per lineal metre.
- Ember-rated gutter guard and valley guard where there is none, or replacement of plastic guard.
- Metal ember guard at the eaves and at the ends of corrugated sheets.
- Replacement of any cracked, slipped or missing tiles and any lifted sheets.
- Mesh screening of vents, and ember screens on evaporative coolers.
- Sealing of skylight and penetration flashings, and a tree lopper for anything over the roof.
On a high fire danger day
- Fit the gutter plugs and fill the gutters.
- Wet down the roof and gutters if you are staying and have water to spare.
- Bring in anything flammable from decks and against walls.
- Follow your survival plan. A prepared roof buys time; it does not make a house safe to stay in on a Catastrophic day.
If you are replacing the roof in a bushfire zone
A re-roof in a mapped area triggers the BAL assessment and the roof must be built to it. At BAL-12.5 to BAL-29 that means sarking under tiles, sealed ridges, metal mesh on every opening and non-combustible guard. At BAL-40 it pushes most people to a Colorbond roof with steel gutters and ember guards, the simplest way to meet the non-combustible requirement, and metal is easier to seal against embers than tile anyway. We build to the assessed BAL and provide the certifier's documentation.
If you would like us to go through your roof against this list, request a free on-site quote and tell us your suburb and, if you know it, your BAL rating. We will tell you what is urgent, what is worth doing and what can wait a year.